CE Marking Flow Chart



- Selection of EU Directive or applicable standards
(IEC, EN) - Receiving of products brochure, specifications,
and other informative materials such as an operating condition and an environment. It is acceptable to check an actual device prior to testing.
- Presentation of a delivery time, cost, test articles and a number of samples
- Acceptance of application and check of contents
- Discussion of a concrete schedule
- Confirmation of receiving a sample and its operation manner and operation mode
- Receiving of a drawing, a parts list, instructions and indications
- Check of a configuration and making a test plan
- Performing an EMC/product safety test
- Determination of continuance or corrective action in case of NG
- Proper advice for a technical action
- Submission of a test report for EMC/product safety test
- Asking the client to provide a necessary technical data and filing them with a test report as TCF (Technical Construction File)
- Preparation of DoC (Declaration of Conformity) containing the necessary articles
- Shipment of products affixing "CE" mark as the designated logo.